QUICK ANSWER: Two quotes for the same Notting Hill house can sit tens of thousands of pounds apart because they rarely price the same job. The gap usually comes from provisional sums, items left out altogether, different specifications for the same line, and how much contingency is allowed. Before you compare totals, compare what each quote actually includes.
If you are holding three quotes and the cheapest is a long way below the dearest, the instinct is to assume someone is overcharging. Usually nobody is. The quotes are describing different projects, and the difference only shows up once the work is under way. Here is where the gaps come from, and how to read a quote so you are comparing like with like.
1. Provisional Sums Hide the Real Number
A provisional sum is an allowance for work that has not been fully defined yet, such as a staircase, specialist joinery, or the cost of dealing with what is behind a wall. A low quote often looks low because it carries small provisional sums for things that will cost more. The total is only a placeholder, and the gap arrives later as a variation.
Ask each builder to list every provisional sum and say how they arrived at the figure. A quote with few provisional sums is not always more expensive. It is usually more honest.
2. What Has Been Left Out
On period properties around Ladbroke Grove, Westbourne Grove and the Notting Hill Gate side, the common omissions are:
- Structural engineer's fees and calculations
- Party wall surveyor costs
- Making good and redecorating after the works
- Skip hire, scaffolding and parking suspensions
- Fees for the Royal Borough of Kensington and Chelsea's planning and building control processes
- Waterproofing and ventilation on any lower-ground work
None of these are optional. If one quote includes them and another does not, the second is cheaper only on paper.
3. The Same Line Can Mean Different Things
"Kitchen: £45,000" tells you nothing until you know the units, worktops, appliances and fitting standard behind it. Ask for specifications, not totals. Where a client has not chosen finishes yet, a good quote states an allowance per item so every builder is pricing the same thing.
4. Contingency and Risk
Notting Hill's stucco terraces and Victorian villas regularly reveal earlier alterations, such as removed chimney breasts, undersized joists or old wiring, once the work begins. A builder who allows for this in the price will quote higher than one who does not and then raises it mid-build. The first approach is easier to budget for.
5. How the Work Is Organised
A tender based on full drawings and a written specification is easy to compare. A tender based on a conversation and a sketch is not. Where several builders have been given different information, the prices reflect different assumptions. Give everyone the same drawings and the same scope, and the quotes start to line up.
How to Compare Quotes Properly
Put the quotes side by side and check, line by line:
- Is the scope identical, with the same drawings and specification?
- Which items are provisional sums, and how large are they?
- What is excluded (engineer, party wall, building control, scaffolding, making good)?
- How is payment staged, and how is it tied to completed work?
- Is the builder FMB-registered, and what contract will be used for larger projects?
A fixed price against full drawings is the clearest basis. Anything else should come with an explanation.
Frequently Asked Questions
Is the cheapest quote always the one to avoid? Not always, but a price well below the others deserves questions. Ask what is excluded and which items are provisional sums. A lower quote that is complete is fine. A lower quote that omits half the scope is not.
How many quotes should I get for a Notting Hill renovation? Three is usually enough, provided each builder prices the same drawings and specification. More than that tends to produce noise rather than information.
Can I ask a builder to explain their quote? Yes, and a good builder will welcome it. A quote you cannot follow is a warning sign, and a line-by-line walk-through takes an hour at most.
Holding Quotes You Are Not Sure About?
Send us the drawings and any quotes you have received, and we will go through them with you: what is covered, what is missing, and where the gaps are likely to appear. There is no charge and no obligation.